If the project calls for the supplier to guide installation remotely, send photos and the clear width, height, and depth of the installation area with the quote request. Include the access route, door openings, and freight elevator dimensions. Have the project’s specialists confirm the attachment points, and agree who will position, assemble, and secure the installation.

1. Three-dimensional site measurements and load-bearing conditions

Specify whether the piece is suspended below a ceiling, freestanding, wall-mounted, or placed at a stair or double-height area. Provide clear width, height and depth and the positions of vents, sprinklers, lights, access panels and nearby furniture. For ceiling work, state the structure and available fixing points; for freestanding pieces, the floor finish and whether ballast is allowed. Structural or building-services advisers normally confirm load-bearing and fixing data; photographs alone cannot establish them.

2. Fixing and safety responsibilities

Agree drilling, anchoring, wall fixing and inspection responsibilities before remote guidance, with suitably capable staff performing the work. State whether ceilings or walls may be drilled, whether suspension cables or dedicated brackets are allowed, any additional fall-protection requirements in public areas, and whether people can touch the installation. Busy hotel lobbies, club corridors and commercial atria need different fixing and anti-tip assessments. Resolve these before approval, not after arrival.

3. Electrical, fire-safety and property-management requirements

For lighting, powered parts or integration with existing lights, provide connection positions, voltage and interface details, and assign wiring and commissioning. Confirm local requirements for decorative-material fire performance, sprinkler clearance and escape-route widths, plus any material documents requested by the property manager or fire adviser. Check product and making records with the supplier; test requirements and local compliance decisions remain project-specific.

4. Package dimensions, access routes and unloading

If pieces travel in sections or components, check access routes against the breakdown plan. Provide unloading position, goods-lift size and capacity, doorway and corridor clear widths, whether repacking or carrying after unpacking is needed, and dry temporary storage. These affect sections, protection and assembly order. For overseas projects, identify who receives goods after customs and how long they will be stored; remote guidance must fit the actual working window.

5. Working windows and on-site support

Replace “as soon as possible” with design-approval dates, desired arrival period, available installation dates and any overlapping trades. Name the site contact for remote guidance—designer, contractor or hotel engineering team—and confirm staff can follow instructions and return photographs or video. Lead times need project checks; dates should not be fixed while information is incomplete.

6. Visual references and acceptance criteria

Site photographs, elevations, ceiling plans and reference images help confirm color, volume and viewing angles, including the main viewpoint and whether the reverse needs finishing. Agree acceptance checks in advance: dimensional tolerances, secure fixings, visible damage and expected lighting effects. Record them in project correspondence so remote guidance has shared assessment criteria.

Not everything is needed at the first contact, but information affecting quotations and fabrication drawings should come early. More gaps mean more assumptions and greater change costs later. Confirm quotations, minimum quantities, lead times and test documents individually. A one-page site brief prepared at inquiry stage makes later discussion easier.